Every prefabricated wooden RIKO HIŠE house can be created until the agreed-upon construction phase.
A building finished on the outside includes a completely manufactured “shell” of the building, including builders’ joinery, however, without installations, floor screeds and sanitary equipment.
A partial turnkey building includes complete floor screeds and rough finishing, whereas the turnkey building is designed to the point that you may put all the interior equipment in it and move in right after the hand-over of the key.
Type of Execution | Building finished on the outside | Partial Turnkey | Turnkey |
---|---|---|---|
External wall elements | YES | YES | YES |
Internal wall elements | YES | YES | YES |
Ceiling above ground floor | YES | YES | YES |
Mansard ceiling | YES | YES | YES |
Roof construction | YES | YES | YES |
Windows and balcony doors | YES | YES | YES |
Front doors | YES | YES | YES |
External shades | YES | YES | YES |
Roof tiles and gutters | YES | YES | YES |
External façade | YES | YES | YES |
External and internal shelves | YES | YES | YES |
Balcony fence | YES | YES | YES |
Transport and car lift | YES | YES | YES |
Assembling and scaffolding | YES | YES | YES |
Floor screeds | X | YES | YES |
Electrical installations | X | YES | YES |
Water installations | X | YES | YES |
Central heating installation | X | YES | YES |
Switches and sockets | X | X | YES |
Sanitary equipment with fittings | X | X | YES |
Supply and placement of floor coverings (ceramics, parquet, etc.) | X | X | YES |
Paintworks | X | X | YES |
Interior doors | X | X | YES |
Interior stairs | X | X | YES |